July 2009
Installation of 4 inch diameter groundwater extraction well for contingency use, at a plantation in Selangor, Malaysia, complete with electrical downhole submersible pump at 50 meters below existing ground level.
September 2009
Hand auger, Mackintosh probing and Test Pits for a Proposed Expansion of Existing Road and Bridge at Bukit Kuang, along the Kemaman-Dungun Road in Chukai, Terengganu, Malaysia. Conducted 75 Mackintosh probes and 75 hand auger soil borings including 10 Test Pits.
October 2009
Mackintosh probing for a Proposed Expansion of Existing Road from Gurun to Yan in Kedah, Malaysia. Conducted 50 mackintosh probe tests along the road shoulders throughout the entire road section.